Dr. Paul Ashkenaz DDS
                        
DDS
Complete gut and rebuild of Endodontics offices, 6 exam rooms and related areas as well as a new lab and x-ray facilities at 25 E. Washington.  High end finishes throughout.312-236-9581
Anne BarclayChildren’s Home & Aid Society

Completed 20,000 sq. ft. buildout at 100 N. Western Ave.  Job was complete gut.  All base building work included new fan rooms, bathrooms and electrical service.

Completed 20,000 sq. ft. remodel of their building at 60th & Marshfield.  Space was completely gutted.  Job included new electric service, new HVAC systems, all new plumbing (sewer-water), all new bathrooms.  All new windows were installed and all exterior masonry work was renovated.

773-455-5200
Mark BelongiaBelongia Shapiro & FranklinRemodel of 10,000 sq. ft. of high end finishes for law firm @ 20 S. Clark Street.312-662-1030
Mary BurkeLakeshore Food AdvisorsRemodeled 4,000 sq. ft. space including all wiring, upgrade lighting and new finishes at 20 N. Wacker Drive.312-348-7080
Lisa Felski
New ControlCame in to assist Lisa after GC had been selected.  Worked with Lisa to save New Control (33 W. Monroe) over $60,000 by adding new subs and value engineering the electrical portion of the project. 312-845-2777
Jennifer Flodin PSAPSAMinor remodel of 3500 sq. ft. space at 125 S. Wacker Drive.  All high end finishes, new wiring and furniture systems.312-214-1500
Joe FullerAlterian
Raw space 20,000 sq. ft. build out at 35 E. Wacker Drive.  All new finishes, upgrade power and IT systems.312-884-5206
Jim GosseNorth Shore PodiatryConstruction of raw space into 8,000 sq. ft. podiatry offices in Glenview.  Job included 8 exam rooms, lab and x-ray as well as all other related areas.847-729-9580
Dr’s. Greenberg & Barber DDSDDS
Complete gut and rebuild of Periodontics offices, 4 exam rooms and related areas at 25 E. Washington.  High end finishes throughout.312-782-4068
Glenn HamiltonBank of AmericaMultiple projects, all residential – Chicago, IL, Lake Zurich, IL and Phoenix, AZ. 
312-339-3701
Tom LaPorteClaro GroupRemodeled 27,000 sq. ft. offices at 70 W. Madison.  All new finishes, upgrade power and IT systems.312-546-3701
Rob LeeInfinium Capital ManagementWorked with ICM for the construction management of their 60,000 sq. ft. headquarters.  Wrote RFP’s for architect, engineer, general contractor, wiring contractor and mover.  Pre-ordered all electrical main switch gear, all HVAC units and battery back-up system.  Assisted with AV and furniture.312-601-7880
Dr. Phil Mc Donnell DDS
DDS
Complete gut and rebuild of dental offices; 6 exam rooms and related spaces including a lab and x-ray facilities at 25 E. Washington Ave.  High end finishes throughout.312-236-9322
Sean MolinaThe Hanley GroupMultiple projects 15,000 sq. ft. overall.  Upgraded power and HVAC for 60 traders.Added conference and    support areas all at The Chicago Board of Trade.312-789-2503
Mike MunroePickens KaneRaw space built out of 15,000 sq. ft. offices, 75,000 sq. ft. production facility and 20,000 sq. ft. back-up storage area in Pickens Kane building (401 N. Milwaukee) for Paper Source.312-942-0330
John Pratt

Renovation of a 2 flat into a single family home.  All plumbing, electric and HVAC were all new.  Main house staircase was moved to the rear, in front of a two story glass exterior wall.  New master bathroom and kitchen with high end finishes.  Major structural work had to be completed to accommodate new layout.312-220-3597
Gary SternStern PinballWorked with Gary Stern for over 30 years.  Built out over 400,000 sq. ft. of office and production spaces over the years.  Jobs were on Diversey Ave. in Chicago, Elk Grove Village, IL and Melrose Park, IL.708-786-7036
Gary WoodThe Lurie Co.

Worked for The Lurie Co. for eight years.  Assisted in the completion of over 200,000 sq. ft. of space at 120 S. LaSalle which included eight building hallways.  Assisted brokers with all pricing and negotiated build out allowances for all projects.  Assisted in the selection of all building standard finishes and pre-ordered all doors/frames/hardware, light fixtures and em devices.


After completion of 120 build outs, John Balanoff moved to 221 N. LaSalle and worked with management for base building work (fan room, bathrooms and hallways) as well as with the brokers to price all projects and negotiate the construction/work letter for all leases.

312-296-2161